Sunday, November 22, 2026

Turkey Trot Trail Cleanup, Kiosk Repairs, Hornets, Waterbars, and Other Fall Adventures

We moved up one of our regular work November work parties to the 21st to get the Turkey Trot Trail cleaned up for our post-Thanksgiving hike.  We also had other maintenance tasks on other trails, so we met on Shelton Ave at the powerlines to divide and concur.

Notice how clean and neat everyone is at the start of the work party.   There were 8 of us running around today.

Jeff Belair got an early start on replacing the roof on the Oak Valley Trail Kiosk.  First he had to demo the old roof as the sun was coming up.  Mark Vollaro had picked up the new supplies and was out mowing the trails along the powerlines on both sides of Rt. 108.   

Mary King warmed up by filling up a bag of trash along the road before the work party got going.  She's an eager beaver trails volunteer and a member of the City's Anti-Litter Committee; always getting things done.

Mark Rowan and Bill Dyer went over to the Cranberry Bog Bridge on Oak Valley Trail to remove a large dead tree that was threatening to fall on the bridge.  

 

That bridge is one of the oldest ones in our system, and was recently rehabilitated by Nolan Peters as part of a Capstone project for high school, so we were trying to make sure the bridge wasn't damaged.

It was a tricky tree to cut due to the leaning and being partially rotten.  Partially rotten trees are opinionated about how they will fall sometimes.  Mark got to try out our weighted throwing line to get a rope on the tree.  Jeff, Bill, Mary & Mark then pulled on the ropes to pull the tree down away from the bridge: team work.  Photo by Bill Dyer

 

Here's the tree and bridge after Mark finished whittling it up.  Nice Job.  Bill Dyer Photo

Meanwhile Ellen Cramp, Bill Donofrio, Mary & The Other Mark were clearing up and down the powerlines and cutting back brush along the Turkey Trot Trail on the north side of Rt. 108.  Portions of the trail were getting brushy from all the rain this summer and needed to be cut back in multiple locations.  I didn't get photos of them, but the trails looked great later in the day.

The Paugussett and Turkey Trot Trails west of the RecPath junction had waterbars that have needed cleaning.  And no, waterbars are not places for hikers to get beverages while hiking.

The steeper sections of the trail have waterbars to divert runoff off the trail and prevent erosion.  The first waterbar was pretty much filled up with debris and not working in this "Before" photo.  Heavy rains would just skip thru it and erode the trail tread downstream.

And the "After" photo.  Debris was removed, sediment excavated, downhill side mounded up, and the downstream outlet channel cleaned out to divert runoff off the trail.

The waterbars are graded with gentle slopes for ease of hiking and biking.  The waterbars are laid out diagonally across the trail to intercept all the runoff coming down the trail.  The downstream channel is extended to get runoff well off the trail; in this case toward drainage ditches along the RecPath that are downhill.

 

Tools of the Trade for waterbars: Rogue Hoes, buckets, loppers, heavy rakes, buckets, shovels; to clear, excavate, and shape the waterbar.  Some of the sediment is very compacted and it is tiring work, but it needs to be done to protect the trail tread from erosion.

 

 WB#2 was also filled up with debris.  Did I mention that it was REALLY busy on the trails today.  Something about it being unseasonably nice warm dry weather for November 21st, right before a forecast storm (that so far hasn't happened yet), and the trails were mobbed with folks out walking their dogs, or running, or biking, or hiking, singles, doubles, gaggles, with large family groups, or groups of friends.   It was nice to chat with everyone as they came through or passed by.

Here's the "After" picture.  Some of it was pretty hard digging.  A large group of hikers came by and said " It looks like you're burying a body".  I laughed and said "funny you should say that", and told them about the recent French's Hill Incident from earlier in the month, in 4 Part Harmony (see other blog post), and they had a great laugh.  One of the hikers was a wonderful woman who offered me one of her water bottles (I had left mine back at the car in a blaze of stupidity in not thinking that it would be hot).  I thanked her profusely.  They were a group of ex-GE employees who get together for fun; nice to see them enjoying Shelton's trail system.


 

Waterbar #3; After photo.  The runoff is directed downhill, and the outlet ditch is dug out and cleared far enough of the trail where the water doesn't run back into the trail tread (Water has a lot of opinions about where it wants to go, much like trees when they've be cut.  Trail work involves a lot of consulting with gravity and Mother Nature).  This waterbar is mostly made of rock topped with earth.

View uphill showing the trail pitching into the waterbar.  The trail tread catches all the runoff from the hillside and channels it down the most worn path; i.e. the trail.  That's why the drainage has to be managed to prevent erosion and carving out gullies.


 Mark Vollaro and Jeff Belair came up later and blew out the leaves and obstructions from the RecPath downhill.  They moved some earlier cut beech logs out of the drainage ditches and moved them well off the Path.


 

Jeff is dragging away a beech branch that can clog a RecPath culvert, and preventing a future washout.  Mark had earlier blow out debris for downstream swales and drainage inlets.  Maintenance is never fun, or exciting, but it's got to be done, every year.


 


Back at Shelton Ave - here's the new cedar roof that Jeff installed on the Oak Valley Trail Kiosk.  Mark V. mowed all around the kiosk and Oak Valley Trail.  The kiosk was also straightened and shimmed up so it wasn't quite as twisted.  When Eversource replaced the kiosk following powerline construction it was kinda bent and Jeff & Co. fixed it up.  We're also going to upgrade the doors and internal contents.
 
 

I looked at the kiosk later in the day and it was covered in hornets.  Big, Nasty, Evil Looking Hornets.

I think there's a nest still some where's inside the kiosk, that Jeff miraculously didn't disturb because he was working early in the morning when it was cold and they were semi-dormant.  But WOW, were they active later in the afternoon when it warmed up.  They were highly interested in the new roof on their home.  We're going to evict them later this week, but in the meantime everybody keep an eye out for them when you check out the nice new roof on the kiosk.

Thanks to Mary, Jeff, Ellen, Mark, Mark, Bill, Bill, and Terry for coming out today.  This morning we managed to:

  • replace a kiosk roof
  • drop a hazard tree
  • not damage a bridge 
  • mow trails along the powerlines
  • dig out 3 waterbars
  • clear drainage ditches
  • cut brush along 2+ miles of trails
  • clean up trash along Shelton Avenue
  • not get stung by hornets 
  • not get run over in traffic
  • not get hurt by a falling tree
  • not injure 10,000 trail users this morning     

Success.  Have a great Thanksgiving and join us for the Turkey Trot Hike on 11/29 at 1:00.
 

 

 

No comments:

Post a Comment