The Lane Street bridge over Means Brook, located near Huntington Street in Huntington Center, will be completely removed and replaced. During construction, Lane Street will be closed at the bridge. Access to Lane Street will be via a temporary paved road over the Rec Path between Wesley Drive and the east end of Lane Street (see map). This section of trail has served as an emergency accessway that can be used in the event of a major fire or other emergency.
Rec Path from Wesley Drive, on emergency access road |
The Rec Path will be widened to accommodate a 22-foot wide temporary roadway (Lane Street is 16 feet wide). This will require major trees to be cut. The road will them be temporarily paved to prevent problems with dust. Expect trail closures while the trail is converted to a paved road.
Rec Path users will then be required to share the road with vehicles for the duration of the project, about six months. When the bridge work is complete, the pavement on the Rec Path will be removed.
Rec Path users will then be required to share the road with vehicles for the duration of the project, about six months. When the bridge work is complete, the pavement on the Rec Path will be removed.
Lane Street from Huntington Street, with bridge. |
Hi, do you know if there is a plan to allow Rec Path users to access Huntington Center via Wesley Drive? Is there a way through the cemetery and Meeting House Lane?
ReplyDeleteYes, people can walk down the temporary road a short ways, but they will be sharing the road with vehicular traffic. But it will be closed while they turn it into a temporary road. No idea how long that will take.