| Indian Hole Bridge, Indian Well State Park |
![]() |
| This stonework at the top of the bridge would be replaced with a concrete wall. |
![]() |
| Extensive retaining walls stretch into the distance |
![]() |
| Indian Hole Bridge as viewed from the east |
| The Paugussett Trail runs below the retaining walls south of the bridge |
Indian Well Road was a little-used gravel road leading to a Scout camp when the state purchased 157 acres in 1928 for the new Indian Well State Park (the cost was only $4,150). At that time, it was reported that "the approach to this park is unsatisfactory and parking space for cars is almost entirely lacking." But the park proved to be popular and by 1936 it had 150,000 visitors a year, including "11,400 camp days." The WPA project was a necessity.
The best way to view the stone retaining walls is to park in the hiker lot across the road from the falls (a street sign points to The Maples). Venture through the woods down to Indian Hole Brook. In normal low summer flow, it is very easy to walk across the water here and go under the bridge. Cross the brook to see the long stone retaining wall heading off to the north. Then go back to the parking area and look for southbound blue trail blazes heading through the meadow and follow the blazes. After the trail enters the tree line, it turns right and then left again on old abandoned pavement. This used to be Indian Well Road before the WPA project. As the trail follows the old pavement, a massive stone retain wall appears to the right, parallel to the trail. Eventually the hiking trail rises up to meet the stone wall, with stairs bringing hikers up to the current Indian Well Road.
![]() |
| Many people go under the bridge to explore |
![]() |
| The red lines are road alignments from a 1934 aerial. (Leavenworth Road and Indian Well Road were realigned after 1934) The bridge is in the upper center portion of the image. |
Construction drawings: Here are some drawings from the DOT showing the existing and proposed work at the top of the bridge. This is from their application to the CT DEEP for a general permit for water resources construction activities (click images to enlarge):
![]() |
| Existing bridge (click to enlarge) |
![]() |
| Proposal, showing stonework replaced with concrete wall |
References:
"Twelfth Biennial Report of the Connecticut State Parks and Forests for the Fiscal Years July 1, 1934 to June 30, 1936" published 1936 by the State of Connecticut.
"Report of the State Park and Forest Commission to the Governor For the Fiscal Term ended June 30, 1928" published 1928 by the State of Connecticut and also the report for 1930 (both are available within a Google ebook that contains multiple reports).
DOT Project Info: Project number 126-172 "Rehabilition of Bridge No. 01602." Contact is Kimberly C. Lesay, Transportation Assistant Planning Director, Bureau of Policy and Planning, CT DOT, 2800 Berlin Turnpike, P.O. Box 317546, Newington, CT 06131, (860) 594-2931
DOT Design Plans: