Monday, February 10, 2025

2025 Goals

The Trails Committee has a very long to-do list, so for 2025, several items were prioritized as goals for 2025: 

  1. Upgrade the mucky approach to the Stockmal Trail bridge. During major floods, there is a current across this area, so secured bogwalk or bridge sections may be appropriate; 

    Flooding across Stockmal Trail at the bridge

  2. Work on recognizing past Eagle Scout projects;

  3. Apply for a DEEP Recreational Trails Grant for the Rec Path (if it is funded for 2025);

  4. Repair three kiosks, starting with the Hope Lake Kiosk (begun);

  5. Build a bridge for the Paugussett Trail at Birchbank's scenic Chimney Junction. This is the most challenging project. The brook has a strong current when it floods. 

  6. Construct a new Curtiss Brook Connector trail to serve as an access trail to the Rec Path at Pine Lake.  This trail would serve as an alternative to walking along Rt 108 in a spot that has no shoulder, something high school student do frequently. Volunteers would construct a 'pilot trail' that could be upgraded if funding allows. 



  7. Build a Boehm Pond access trail off of Corn Hill Drive as requested by residents. This is a project best routed during mud season in order to find a dry route. 


Sunday, February 9, 2025

French's Hill Winter Work Party

2025 is off with a bang.  The groundhog sees his shadow and we start getting a snowy winter in February.  Saturday we met at French's Hill to cut back brush before it snows tonight.

We had a good crew to work on cutting barberry and blow downs.  The parking lot was a bit icy, but passable.  Thick pants and sturdy work boots are encouraged, along with warm gloves, hats, and safety gear.

It took a little while to get started, but we got squared away and broke into groups.  Mark & Ray went over to Granderson Place to clear a blow down and cut stuff going out on the Red Trail.  They also cut stuff later at Oak Valley Trail.  Bill, Aidan, and Kaden cut back brush and cleared debris along the entry drive and parking area.  Ellen, John, Danny, Bodie & Larry worked their way in along the trails.  Terry took the brushcutter away from the other folks so it was safer.

John is clearing briars along the trail entry.  The sickle bar attachment is good for getting the brushy stuff, and prevent an explosion of briars in the spring.

There were newer blow downs from recent storms.  We'll need to come back for this one on the White Trail, but it's passable for now.

Barberry was cut next to the trails, and a lot of clumps cut off trail.  The barberry will re-sprout in the spring, but it'll be smaller green growth that can get cut more easily with lighter tools.   This will make it less of a crisis during April to June when everything needs to be cut at once, and it may allow some native species to sprout and compete for space and help the forest environment.  

The 3-bladed brush knife and smaller guard are a better combo for cutting barberry.

The White Trail was nice and peaceful (when we weren't working with power tools).

Helpful Trail Tip:  Micro-spikes on your boots are great for packed down trails that are icy.  Mine, of course, were home resting in a nice dry warm drawer.

Judging from the tracks, a lot of local residents have been using the trails.  One of the reasons for preserving Shelton's Open Spaces.

Near the end of the end of the work party, a couple of younger volunteers wanted to try out traditional clearing techniques on a dead snag which normally we leave up for the woodpeckers (but we have a few snags to spare at French's Hill), so here's Bodie.

And Danny going at it.  Apparently, it was warm work.

Timber! (nice thumb)

Team work - The End.  Hopefully, they can shovel tomorrow.

Thanks to everyone who came out on a chilly morning; Mark, Ray, Ellen, Larry, Danny, Bodie, John, Aidan, Kaden, Bill, Terry.  There's more to cut, but this was a good start on our Pre-Spring Clearing.

Now we just wait for snow tonight and then the Super Bowl.  Have fun exploring French's Hill and bring your tracking guide.