Tuesday, October 15, 2024

Paugussett Trail Improvements at Wiacek Meadows Continue

 

A "to-do" status list in map form

Now that the growing season is over, it's time to get back to the Paugussett Trail improvements at Wiacek Meadows. By the way, that is the current working name for the open space property located to the north of the High School, between Constitution Blvd North and Meadow Street. Wiacek is pronounced "WHY-seck." Or possibly WHY-a-seck. The above map shows the overall plan and our progress. As you can see, most of the tasks have been completed. Part D was just completed last week in an afternoon. That involved shifting 160 feet of trail off an eroded gully. 

October 2024 reroute (160 feet)

Part E has just begun. This is the ~350-foot section that floods during the wet season, sometimes for months at at time. There is no possible reroute -- it's all wet in every direction. It's not a skunk cabbage mucky type of wet, which would be worse. Rather, it's a hard pan hilltop with roots everywhere type of wet. In the summer it all dries out and is fine to walk on except for roots and rocks. 


April 2024 conditions

Although this section of the Paugussett doesn't get a lot of use, it must have at least a few regular users because last spring someone put down long branches on the trail, parallel to the direction of travel, which is a big no-no. Stepping on a log or branch parallel to the trail is just asking to slipping into the mud. And the mud wasn't that deep, so people with hiking boots could have just walked right through it except these branches were in their way.  Not helpful!

April 2024 conditions
Section with rocks

Over the years, some sporadic efforts were made to put down rocks in places, with varying levels of quality control. Some sections of rocks aren't too bad, but some are very uneven and pretty tedious to walk on.  

Summer conditions:
Lots of roots and rocks!

During the summer, the trail dries out, but all the rocks and roots have been a serious annoyance. The first task will be to create a summer treadway, with many of the rocks and roots removed or covered over.  Most people hike during the dry months. That part has been started: 


A summer treadway cleared
on the left of the rocks

After a summer tread has been cleared out, the winter/wet season tread will slowly be improved. Some parts of the trail will get new 8-foot bog walks consisting of a pair of 2"x8" boards resting on top of 5x5 sleepers.  Other parts of the trail will likely have some rock work done. The goal is for these improvements to be off to one side so that people can choose to walk on the dirt when things are drier. 

None of this will be quick or easy. If anyone would like to help out, please let us know

Sunday, October 13, 2024

RecPath Repairs at Lane Street

The boardwalk through the floodplain at Lane St. needed repairs.  It had been put off for a while due to all the storm damage restoration and clearing.  Having finally gotten a breather from Mother Nature, we tackled Lane St on a beautiful Fall Saturday morning.

Betsy, Aidan and Gia were our cutting and clearing team.  The briars and brush was growing into the RecPath and was cut back from Lane St. to the woods at the end of the Land Trust meadow.

This was one of the "Before" shots of the boardwalk.  One of the boards was really missing, and a number had holes or were on the way out.  These decking boards needed to be replaced.  

A surprising amount of planning goes into even a simple work party like this one.  One of the preliminary steps was estimating the materials and tools necessary, and getting them to the job site.

Going to Home Depot in Derby for supplies on Friday Night before a work party - good times.  The decking boards at Lane St. were 5/4 x 6" x 6' which isn't sold, but 12 footers are.  Home Depot normally doesn't cut pressure treated lumber.  So we brought a saw with us and did a little cutting in the parking lot to modify the boards to fit into the car.  Oddly, nobody at the store came over to ask me what I was doing at 9:15 at night cutting boards in their parking lot.  I guess it's not the weirdest thing they've seen.  We also got screws and a tool for pulling nails.

The next step was to drive the boards over to Lane Street, put on a headlamp, and carry them in part - way for tomorrow's work party.  It was a pretty night, and I could see my breath.  Fall is here.

Saturday morning was the usual crazy  running around getting tools at the Barn.  We really have to do a better job pre-planning and packing up all the tools in bags the week before so we don't forget things, which happened.  Then drive to the trailhead and deliver the tools to Lane St. where I met Bill Dyer: who, for awhile, looked like the rest of the work party, but then people came rolling in and we got started.

Devin and Mike are replacing the deck boards.  There was a lot for heavy work removing the old deck boards and some of the screws (square drive & torx head) were stripped and had to be pried out or cut off.

The RecPath was pretty busy; there were a lot of runners and bikers.  After some near incidents, we strung flagging across the Path.  People could still pass after we gave them permission, but they had to walk and not just push by.  We wanted everyone to be safe and not get hurt; including us.  

Using the flagging to actually close the trail around the work area worked well.  We removed the flagging at the end of the job.

Some of the boards came out in one piece and others had to be cut out.  A variety of crowbars helped too.  Betsy brought her garden cart with her and hauled all the old boards out the the trailhead.  We will contact the Shelton Parks and Rec. Dept. to see if they can pick them up, otherwise it'll be a dump run next week.

The deck boards are attached to stringers elevated on timber piles set in the marsh.  Some of the screws were stripped and couldn't be pulled out.  These were cut off with a small reciprocating saw with a metal cutting blade.  Some side rails were bolted to the ends of the boards (another trip back to the car for the adjustable wrench that was forgotten).  

Interesting fact: there's a lot of animal tracks visible in the mud under a boardwalk that you only see when you're kneeling on the boardwalk looking upside down trying to loosen carriage head bolts.

Meanwhile Aidan was cutting back briars with one of the electric hedgetrimmers.  We had cut this area earlier in the year, but brush +sun +water =lots of growth + thorns.

Gia got some hands-on quality trail time with the loppers and trimmer.  The RecPath looked a lot better when they were done with it.  Now all we have to do is work on the grass to get our full crushed stone width back, but that's for another day.

Devin & Bill were replacing one the last boards.  We replaced 8 broken or spongy boards in all, and the RecPath Boardwalk is back in serviceable condition.  Nice job.

Mike, Gia, & Devin on the repaired Lane St. Boardwalk at the end of the job.  We hauled all the tools back out to Lane St, loaded the cars, and Mike & I put things away at the Trails Barn.

The Shelton Land Trust's Hawley Meadow along the RecPath is at the end of the boardwalk- a "Before" picture.

Thanks to everyone who came out:  Aidan, Devin, Gia, Betsy, Bill, Mike & Terry.  Maintenance is seldom glamorous, but it was a good fall morning to be outside.  

And as Bill put it "I am impressed how we were able to replace bad boards without anyone getting tetanus, at least that we know".  Now There's a performance metric for success on a work party.  

Go visit the RecPath at Lane St. - it's really pretty right now.  Also check out the events page for our Full Moon Hike on October 17th (that's THIS Thursday).


Wednesday, October 2, 2024

The Paugussett "Indy Link" Improved

A better tread for the wet season

The "Indy Link" section of the Paugussett Trail is probably no one's idea of a hiking destination, but it's an important connection between Shelton Lakes and other open space properties like Housatonic Woods and Indian Well. It now has a better treadway that will hopefully remain dry during the wet season and have fewer annoying roots and rocks.  

The Indy Link section of the 
Paugussett Trail

The woods are poorly drained and we've had lots of problems with the trail over the years. Parts were previously relocated and we have several Scout bridges. North of the bridges, the treadway became confusing the past few years. It was originally routed on higher ground covered with tree roots, but summer trail users took the lower ground instead, packing in a treadway over temporarily dry wetlands and up drainage gullies. The higher ground grew over with vegetation and the lower ground became a morass during mud season. 
Treadway (right) separated from
drainage gully (left)

The trail tread has now been reestablished back on higher ground and clearly delineated, with material added to help with the tree roots. Another reason for excess mud was people placing rocks in the middle of a drainage channel, damming it up. That keeps happening around town.  If the trail is wet, please don't screw up the drainage even more with logs or rocks. Anyway, the dam was removed, the drainage channel reclaimed, and large stepping stones were placed in a few muddy spots. The one remaining low spot was then given an 8-foot section of bog walk. 

New bogwalk

Some of the existing Scout bridges have decking boards that are rotting out. The worst boards were replaced for the winter, but the remaining decking is getting spongy and will need to be replaced within the next year or so. We've learned that 1" boards rot too fast, so they'll be replaced with 2" boards. 

Rotting boards

OK now until next year

The next section of the Paugussett requiring attention is the Meadow View section just south of Meadow Street, which last winter was covered in mud for a few hundred feet. This probably needs a long bog walk. Stay tuned!